We had more snow last night and today, anywhere from 5-10 inches reported between the rent house and the new house, which was lower than expected. Even though we had some above freezing temperatures between the two snowstorms not much melted at the house since a lot of it is on the first floor. We hope that the builder will dig the house out over the next couple days and they can get back to work as the weather is expected to get into the 50s-60s starting Sunday.
From talking to the builder he thinks we have about 4 days of framing left (includes putting in the windows) and 2 days to roof it. April is trying to get some time over the next week to start picking out the tile for the bathrooms, the kitchen and the harvest room. Once she has those picked out we will be moving to deciding on the types and colors of the faucets, toilets and bathtubs throughout the house.