Monday, January 10, 2011

Framing Delay

Well with the snow storm that came through, framing has been delayed. It is still snowing a little here, but it is mainly in patches and not the expected 1-3 inches. They hope to do all the chalk lines tomorrow in anticipation of starting Wednesday.

We did make some color decisions on the windows (Beige) and door hinges (Oil Rubbed Bronze) today. Also as we were worried about getting some of our larger furniture into the master bedroom, some things have been moved around in the utility room. This will allow a larger door from the utility into the master suite in case we cannot get the furniture through the master bedroom's 90 degree turn hallway.